System integrator NHOA Energy will provide Spanish transmission system operator (TSO) Red Eléctrica with 140MW/105MWh of BESS for two separate storage-as-transmission projects on the Balaeric Islands.
The government of Alberta, Canada, has selected advanced and clean energy projects to receive CA$33.7 million (US$24.83 million) in grant funding, including a hydroelectric-plus-supercapacitor technology pilot.
Audrius Baranauskas, head of innovation at Lithuanian TSO Litgrid, talked Energy-Storage.news through its 200MW storage-as-transmission BESS units, deployed by system integrator Fluence.