The Winners Are Set to Be Announced for the Energy Storage Awards!

Energy Storage Awards, 21 November 2024, Hilton London Bankside

Fluence’s new Utah manufacturing facility part of regionalisation drive; Europe site planned for 2024

LinkedIn
Twitter
Reddit
Facebook
Email

Fluence’s new Utah facility is part of a wider move by the company to regionalise its manufacturing closer to customer markets across the globe, the company has told Energy-Storage.news.

Peter Silveira, senior director of manufacturing for Fluence, explained that its new contracted manufacturing facility in Utah, US, will be a ‘value-add’ facility for BESS modules en route to US customers.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

That means that its existing contracted manufacturing facility in Vietnam will continue to produce the base, modular 6th generation Cube units – the building block of all Fluence’s energy storage solutions – which will then be sent to the US site for customisation and configuration in line with the customer’s needs.

The Vietnam facility will continue to provide the full-build solutions for the Asia-Pacific and Europe markets, he said. Regionalising the final part of assembly to the US gives three main benefits for serving that market.

One is a greater ability to customise BESS solutions within the same schedule. Two, it decreases the impact of supply chain disruptions by moving the final assembly closer to the market. Three, it gives the company more control over costs.

Sending the company’s base modular concept instead of fully-formed and customised BESS solutions to the US increases the company’s choice of charters, vessels and logistics companies for transportation, too. A large part of this is because a fully-formed system is classed as ‘dangerous goods’, unlike the base concept.

Silveria has been senior director of manufacturing for Fluence since August 2020 and reports directly to Fluence SVP & chief supply chain and manufacturing officer Carol Couch.

Fluence also recently announced its Fluence Spares Direct service through two spare parts hubs in Ireland and Utah, although Silveira said these have been operational for over a year, pre-dating its regional manufacturing initiative. The main aim of these is to reduce downtime for operational BESS projects, he said.

The hubs mainly stock components which the company can predict will be ‘troublesome’, and can ship these to sites in 24 hours, versus two weeks from Vietnam.

When asked about the company’s roadmap to regionalising its manufacturing to the European market, where it is very active, Silveira said the company plans to take a similar approach to what it’s done in the US in terms of Vietnam producing the base unit, which can then be customised closer to delivery.

“We’re actively pursuing partnerships there from a contract manufacturer perspective. Our goal is to complete that in the latter part of 2023, with expectations to go live in 2024. So following the same methodology that we have in Americas, we will carbon copy that for our European contract manufacturer,” he said.

He added that with Europe’s substantial gigafactory push, additional battery cell capacity will come online potentially allowing Fluence to move even more of its production there. There are pros and cons to having battery supply closer to markets, Silveira said, but “we see more pros”, he said. He cited the partnership the company has with Northvolt in Europe.

He reckons Fluence will be able to get to a situation where 70% of the commodities (by value) it procures to produce its solutions come from local markets – i.e. where its customers are – and 30% from elsewhere.

18 March 2025
Austin, Texas
The Energy Storage Summit USA is the only place where you are guaranteed to meet all the most important investors, developers, IPPs, RTOs and ISOs, policymakers, utilities, energy buyers, service providers, consultancies and technology providers in one room, to ensure that your deals get done as efficiently as possible. Book your ticket today to join us in 2025!
18 March 2025
Sydney, Australia
As we move into 2025, Australia is seeing real movement in emerging as a global ‘green’ superpower, with energy storage at the heart of this. This Summit will explore in-depth the ‘exponential growth of a unique market’, providing a meeting place for investors and developers’ appetite to do business. The second edition will shine a greater spotlight on behind-the-meter developments, with the distribution network being responsible for a large capacity of total energy storage in Australia. Understanding connection issues, the urgency of transitioning to net zero, optimal financial structures, and the industry developments in 2025 and beyond.
27 May 2025
London, UK
At the time of writing, Europe had had its most successful year in terms of Power Purchase Agreements (PPAs) with a record 7.8GW of renewable energy contracts signed. As we gather in May 2024 for the third edition of the Renewable Energy Revenues Summit, the energy landscape continues to evolve rapidly, influenced by the beating drum of climate change, volatility around power prices and the need to decarbonise power procurement as well as generation.

Read Next

November 28, 2024
SolarEdge has closed its utility-scale battery storage division, resulting in a layoff of roughly 12% of its total workforce.
November 28, 2024
A resolution aimed at rescinding access to the 45X manufacturing tax credit for companies with links to ‘adversarial foreign governments’, primarily China, has been submitted in the US House of Representatives.
November 28, 2024
The 1,680MWh Waratah Super Battery, which completed its energisation in early September, was called upon yesterday (27 November) to prevent widespread blackouts in New South Wales, Australia.
Premium
November 27, 2024
Fluence has ‘met or exceeded’ its financial guidance metrics for its 2024 fiscal year and expects to see ‘significant growth’ in its FY2025.
November 27, 2024
Callum McGuinn, partner at European intellectual property (IP) firm Mewburn Ellis, rounds up the major advancements in battery cell technology that BESS industry sources should be aware of.

Most Popular

Email Newsletter